01

Define who completes each processing step

A roll and a finished panel have different delivery scopes. For rolls, explain whether cutting, hemming, grommets or repacking will be needed and who will do that work. A product photograph does not establish which processing steps the quotation includes.

For panels, put finished width, length, color, edge treatment and grommet sides on the same specification line. Confirm accessories separately. Hemmed edges and grommets alone do not establish suitability for every fixing point or installation.

02

Separate roll, cut-blank and finished dimensions

Roll dimensions describe the supplied width and length. Cut-blank dimensions describe a piece before hemming or other finishing. Finished dimensions define the width and length to be accepted at delivery. Have the processor establish blank sizes and the measurement method for the agreed edge construction; do not apply one assumed allowance to every fabric.

List each finished size, color and quantity, then check usable roll width, length and cutting direction. Rolls with equal area but different widths may not suit the same layout. Whether blanks may be rotated or joined depends on the particular material and order requirements; neither should be assumed.

03

Worked layout: 20 square meters does not mean five blanks

This is a hypothetical arithmetic example, not a Jinhongyuan stock size, supply offer or guaranteed finished yield. Assume a usable rectangle 2 m wide and 10 m long, with agreed cut blanks of 1.2 m × 3 m. Use one orientation in a straight grid, with no additional edge trimming, defects or cutting gaps. The 1.2 m × 3 m dimensions refer to cut blanks, not finished hemmed panels.

Across the width, the whole-number part of 2 ÷ 1.2 is 1. Along the length, the whole-number part of 10 ÷ 3 is 3. This layout produces 1 × 3 = 3 cut blanks. Dividing area gives 20 ÷ 3.6 ≈ 5.56, but the shape and width of the remaining material do not produce five complete blanks in this layout.

This is not proof of the best possible layout, nor a count of accepted finished panels. An actual order still needs confirmed processing allowances, permitted orientation, usable dimensions, inspection requirements and offcut handling. For mixed sizes, request a cutting plan with quantities by size rather than only an area-utilization percentage.

04

Compare quotes for the same accepted finished order

First confirm the same agreed material and finished requirements. Two items described as shade net do not necessarily have identical material, performance or processing suitability. List the work excluded from each quotation before comparing the cost of completing the same size schedule.

  • Do not compare price per roll directly with price per panel. Align the finished size schedule, quantity and cost scope first.
  • For a per-panel calculation, identify the denominator as the agreed accepted quantity for the same schedule. Calculate different sizes separately.
  • Leave cutting yield and processing charges pending where unconfirmed, rather than presenting a precise finished cost based on guesses.

表格可左右滑动查看

CheckBuy rolls and process themBuy hemmed, grommeted panels
Dimensions and quantitiesConfirm usable width, blank sizes and cutting yield by sizeConfirm finished sizes, measurement method and accepted quantities
ProcessingAssign cutting, hemming and grommet fitting separatelyConfirm included operations in writing; list accessories separately
Waste and offcutsAgree who handles trimming, trials, rework and offcutsAgree how rejected pieces and quantity shortfalls are handled
Packing and freightInclude roll transport, repacking after processing and onward transportCheck individual packs, mixed cartons and delivery scope
Cost basisList material, agreed processing, packing and transport chargesSeparate included items from additional charges
05

Include packing and receiving requirements

Explain whether the material is for further processing, wholesale distribution or individual sale. Agree on pack contents and how sizes and colors will be identified. Packed dimensions and weight need measurements for the selected product and packing.

Provide the destination and any requested arrival date, then discuss production and transport separately. Available specifications, minimum quantities, processing charges and delivery timing are confirmed for the actual order.

06

Send the open cutting and processing questions with your RFQ

Use this checklist if the supply format is undecided. Start with your known finished-panel needs and leave blank sizes and the roll layout for the processor to confirm instead of guessing values to complete the form.

  • Confirm grommet layout, tolerances, available specifications, minimum quantities and timing for the particular product and order.
  • Use the agreed sample, processing drawing and written order as the delivery reference.

Application and agreed material / sample: ____

Finished size, measurement method, color and quantity for each item: ____

Blank sizes and processing allowances: confirmed ____ / processor to confirm

Usable roll width and length, with cutting plan by size: confirmed ____ / pending

Parties responsible for cutting, hemming, grommets, inspection and packing: ____

Agreement on offcuts, rejected pieces and quantity shortfalls: ____

Accessories, packing, destination and included charges: ____

Supply format: rolls / finished panels / compare both against the same schedule